The full workflow
TLDR;
See the complete production budgeting workflow from template to PDF offer in one walkthrough. Everything you learned in 5 days, applied to a real production scenario. Day 5 of the Splinde onboarding guide.
The Complete Splinde Workflow
This is the final guide. Over the past four days, you learned about templates, AddOns, Variables, collaboration, scenarios, and offer documents โ each in isolation. Today, you see how they all come together. One production, start to finish.
Watch the Video (2:40 min)
[Video Embed: Day 5 โ The Complete Splinde Workflow]
The Workflow: From Empty Workspace to Finished Offer
Here is the complete process, step by step.
Step 1: Create the Budget
A new project comes in. You go to your workspace, click New Budget, and pick a template. If your team has saved a custom workspace template (see Day 1: Templates), you select that โ so you start from the structure your team has agreed on as the standard.
Enter the project name and client. Your budget is open, with the full section structure ready to fill in.
Time: under 1 minute.
Step 2: Fill in the Numbers
You go through the key positions: Producer, Director of Photography, Production Designer, Equipment, Location, Postproduction. For each line item, you enter the Amount, Days, and Fee. The totals calculate as you go.
If you are working internationally, you switch the currency on any line item โ euros, US dollars, British pounds โ and the conversion happens automatically using live exchange rates.
Time: depends on the complexity of the production. A commercial budget takes 15โ30 minutes. A feature film budget takes longer.
Step 3: Add Calculation Rules
For salary positions, you drag AddOns from the library onto the line items:
Overtime on the Producer
Markup on the Director of Photography
Employer Social Contributions on all crew positions
Each AddOn configures in seconds. The stacking order is handled automatically. No formulas to write, no cell references to maintain. (See Day 2: AddOns & Variables for details.)
Step 4: Set Up Variables
You define the production parameters as Variables in the sidebar:
Shooting Days = 4
Prep Days = 2
Wrap Days = 1
Then you link them to the relevant line items by typing @ in the Days field and selecting the variable. Every salary position that references @Shooting Days is now connected. Change the variable once, and the entire budget recalculates.
Step 5: Invite Your Team
Your line producer needs to see the budget. You go to the sidebar, click Invite, enter their email, and choose the Member role. They join within minutes and can edit alongside you in real time. No file to send, no version to merge. (See Day 3: Collaboration for details.)
Step 6: Model Alternatives with Scenarios
The client wants an alternative. You click New Scenario, name it "Budget Option B", and adjust the variables and fees. The delta shows you instantly how this option compares to the main budget โ section by section, euro by euro.
If you need a third path, you create another scenario. All paths live inside the same budget. (See Day 4: Scenarios & Offers for details.)
Step 7: Write the Offer and Export to PDF
You switch to the Offer Document editor within the same budget. You write your proposal text โ the introduction, the production approach, any notes for the client. You press / and insert a Cost Overview block. The budget numbers populate automatically.
If the client wants the alternative version, you select the scenario from the dropdown. The document updates.
You click Export. A professional PDF offer document is generated โ budget numbers, proposal text, all formatting in place. Ready to send.
Time from scenario to PDF: under 5 minutes.
The Complete Stack
Here is everything Splinde gives you in one place:
Feature | What It Replaces |
|---|---|
Templates | Copying old Excel files and hoping the structure is current |
AddOns | Writing and debugging formulas for overtime, markup, social contributions, VAT |
Variables | Manually changing the same number in dozens of cells |
Collaboration | Emailing spreadsheets and merging conflicting versions |
Scenarios | Duplicating files and renaming them "v4_final_final.xlsx" |
Offer Documents | Copying numbers from Excel into Word and reformatting every time |
PDF Export | Spending an hour on layout before you can send the offer |
Currency Conversion | Looking up exchange rates and building manual conversion columns |
Your Trial
Your trial runs for 7 days. Everything you build during the trial โ budgets, templates, team members, scenarios โ stays when you continue with the Pro plan.
What the Pro plan includes
Unlimited budgets and scenarios โ no limits on the number of projects
Real-time collaboration โ invite as many team members as you need
Live document sync โ offer documents that update from your budget
All templates โ AICP, SCoPE, FFA, and custom workspace templates
All AddOns โ the full global calculation library
Currency conversion โ live exchange rates
Questions?
If you have any questions about the product, about migrating your existing budgets, about anything โ write to care@splinde.io or reply to any of the emails from Joshua. Every message is read personally.
Thank you for going through the onboarding. We are looking forward to building the future of production budgeting together with you.
Last updated March 28, 2026
