Help

Overtime

Overtime should only apply to my shoot days, not prep and wrap

Overtime should only apply to my shoot days, not prep and wrap

It depends on how your budget is built. If prep and shoot sit in separate Sections, put the Overtime AddOn only on the shoot lines. If you plan prep, shoot and wrap days on one position, use a Production Cost Item and split its days in Individual mode. Splitting the days works in every budget.

Your budget has separate prep and shoot Sections

Many budget formats keep each phase in its own Section, for example a pre-production Section and a production or shooting Section, with a line for the position in each. There the Section already separates the days.

  1. Open the sidebar Insert tab, then AddOns, and drag Overtime onto the position's line in the shooting Section.

  2. Set the standard day as the Base, the hours above it and their uplift.

  3. Leave the lines in the prep and wrap Sections without Overtime. They stay at their plain rate.

Use Simple if every shoot day runs equally long, Individual if only some of them do.

Your position carries prep, shoot and wrap days on one line

  1. Make it a Production Cost Item and set its Prep, Day and Wrap counts, for example 2, 3 and 1.

  2. Drag the Overtime AddOn onto it and set the rates.

  3. Click the mode button until it reads Individual. The Days slider appears, running over all the position's days.

  4. Split the days into blocks in the order the schedule runs: prep first, then shoot, then wrap. Hover between two handles, click the +, and drag the handles to where each block ends.

  5. Give each block its hours. Prep and wrap at the standard day reach no section above the Base and pay nothing extra; the shoot block at its long day pays the overtime.

When the schedule changes, change the day counts and move the block ends; the overtime follows.

A worked example

A gaffer with 2 prep days, 3 shoot days and 1 wrap day on one Production Cost Item, Fee 500, an 8-hour standard day and a section above the Base up to 12 hours at 50 percent. The hourly rate is 500 divided by 8, which is 62.50, so four overtime hours cost 4 times 62.50 times 1.5, or 375 a day.

  • In Simple, all six days on the line count as long days: 2,250.

  • In Individual, with prep at 8 hours, shoot at 12 and wrap at 8, only the three shoot days pay: 1,125.

In a budget with separate Sections, the same 1,125 sits on the gaffer's line in the shooting Section, and the prep and wrap lines carry none.

Good to know

  • On a Production Cost Item the Overtime AddOn covers Prep, Day and Wrap together, which is why Simple charges every day. Individual is what separates them.

  • The middle day field shows the name of its unit, Day on a new Cost Item. If you clear the unit, it reads Shoot.

  • The Days slider runs as far as the position's total days. When you add a shoot day, extend the shoot block to match.

  • Simple and Individual are the Overtime AddOn's own modes. They are separate from the Unified and Individual modes of percentage AddOns.

Last updated November 17, 2026

Built for production teams who budget for a living.
From next-gen producers to established media productions.

  • CNDY
  • Tantor Films
  • Cobblestone
  • Recom Film
  • House of Communication
  • SOHA
  • Soup Film
  • Call Productions
  • Aalto Production

Say goodbye to spreadsheets.

Discover how Splinde can streamline your budgeting.